CHAPTER I GENERAL DESIGN GUIDELINES Revision Date
Appendix A: Safe Room Special Inspections 3/1/09
Appendix B: Recommended Pipe Chase Clearances
Appendix C: Architectural Fee Sample Invoice
Appendix D: FEMA Design Invoice
CHAPTER II GENERAL INFORMATION 3/1/09
Requirements for bidding:
A Bidding/Award of Bids
B Pre-Approval of contractors
C Equal Employment Opportunity
D Immigration & Nationality Act
E AIA General Conditions
Supplementary Conditions:
F Warranties
G Taxes in Lieu of General Conditions
H Bonding
I Permits, Fees, and Notices
J Contingency Amounts/Contingency Change Orders
K Schedule
L Construction Time and Liquidated Damages
M Insurance
N Hazardous Materials
O Application for Payment
Project Management:
P Material Substitutions
Q Access to Buildings
R Behavior Standards
S Sexual Harassment
T Safety of Persons and Property
U Contractor Facilities and Temporary Controls-New Construction
V Contractor Facilities and Temporary Controls-Remodeling and Infrastructure Revisions
W Project Closeout
Appendix A: Bond Contract Submittals Checklist
Appendix B: USD 259 Incident Report
Appendix C: Contractors Final Payment Application Checklist
Appendix D: Mechanical Inventory Sheet
Appendix E: Waste Ballasts / Mercury Lamps Worksheet
Appendix F: Sample CCO
Appendix G: Architect’s Final Checklist
CHAPTER III SITEWORK STANDARDS 3/1/09
A General Information
B Existing conditions
C Utilities
D Utility Accounts
E Pedestrian/Emergency/Vehicle Circulation
F USD #259 Transportation
G Parking
H Landscaping
I Soil Treatment
J Fencing / Pipe Barriers
K Site Signage/Flagpoles
L Playground Equipment
M Deliveries / Docks
N Trash Service
O Generator PAD
Appendix A: District Signage Guidelines
Appendix B: Typical Plan – Elementary Playground Paved Area
CHAPTER IV ARCHITECTURAL STANDARDS 3/1/09
A Concrete
B Masonry
C Metals
D Wood and Plastics
E Thermal and Moisture Protection
F Doors and Windows
G Finishes
H Specialties
I Equipment
J Furnishings
Appendix A: Typical Elementary Classroom Millwork
Appendix B: Elementary Multipurpose Room Floor Markings
Appendix C: Size and Electrical Requirements Elementary Kitchen
Size and Electrical Requirements Elementary Kitchen cont.
Appendix D: Typical Elementary Kitchen Layout
Appendix E: Acoustical Treatment
Appendix F: Sound Absorbing Wall Panel
Appendix G: Volleyball Floor Sleeves/Access Plates
Appendix H: Countertops
CHAPTER V ATHLETIC STANDARDS
To be provided at a later date as applicable.
CHAPTER VI FINE ARTS STANDARDS
To be provided at a later date as applicable.
CHAPTER VII MECHANICAL STANDARDS 3/1/09
A General Information
B Heating, Ventilating and Air Conditioning Systems
C Additional Mechanical Equipment
D Ductwork
E HVAC Close-Out Procedures
F Automated Systems Controls
G Plumbing
H Fixture Heights
Appendix A: Uniform Plumbing Code
CHAPTER VIII ELECTRICAL STANDARDS 3/1/09
A Electrical Service and Distribution Equipment
B Branch Circuit Requirements
C Raceways
D Conduit Installation
E Transformer Grounding and Bonding
F Non-Linear Loads
G Surge Suppression Equipment
H Emergency Power Systems
I Fire Alarm Systems
J Interior Illumination
K Exterior Illumination
L Electrical Devices and Circuits
M Cable Television (CATV)
N CCTV Camera System
O LCD Projectors
P Intercom
Q Security
R Clocks
S Bells
T Kilns
U Cable
V Electrical Close-Out Procedures
Appendix A: Attachment 1 Orton Kiln Vent II
Attachment 2 Orton Kiln Vent II cont.
Attachment 3 Orton Kiln Vent II cont.
Attachment 4 Orton Kiln Vent II cont.
Appendix B: Electrical Approved Products List
WAN/LAN
A WAN/LAN Requirements
B WAN/LAN/Phone System
C Network General Design Standards
D Network Accessories
E Racks and Rack Equipment
F Conduit Installation
G Cable Installation Methods
H Terminations
I Project Closeout
Appendix A1: Acceptable Products List
Appendix A2: Acceptable Products List
Appendix B: Heat Generation Table
Appendix C: MIS Contact List
Appendix D: Node Room “A”
Appendix E: Patch Panel Example
Appendix F: Bond Rack Example
Appendix G: Jacks Example
Appendix H: Leviton
CHAPTER IX CAD DRAFTING STANDARDS INTRODUCTION 3/1/09
A Required Submittal of Construction Drawings
B Required Contents of Quick Plan Drawing (QPD)
C QPD Conventions
D Field Verification of QPD Drawings
E Required Contents of Site Utility Drawings (SUD)
F SUD Conventions
G Field Verification of SUD Drawings